Latest Happenings at Eden-Page2Back to map page Back to Index page
Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 See the pictures here first!
21/12/00 Tarmac pathways being laid. Lake work is also going on at speed. 21/12/00 Shortest day, lowest sun, pathways being laid for biome access. 15/12/00 Third and last roof fitted to water store. 21/12/00 Pathways going in. 13/12/00 Many of the car parks which were full in summer, are now used for soil and plant storage. There is still time to visit before Eden is closed from 7th January 2001 until March. 13/12/00 Lake is being pumped out again. Work goes on in spite of the amount of rain. 13/12/00 Full picture of the warm biome. Water storage lake full after winter rains 13/12/00 Warm gets a final adjustment to the vents. The lake and arena has a lot of activity. 13/12/00 Temptation is coming along nicely. The grass roof will soon need cutting as it continues to grow. 05/12/00 Eden's shop really busy and the sound of carols in the street.
05/12/00 Father Christmas at Eden and a happy Christmas picture of visitors awaiting a train
02/12/00 Tim Smit at Watering Lane Nursery-Some of the amazing plants in the nursery. 25/11/00 Loads of plants waiting in Orange car park. 29/11/00 Tim's talks and biome views 25/11/00 Warm biome - louvered air vents in place. Arena matting to hold soil fitted.
25/11/00 Temptation looking good and green. Warm biome gets final touches. Planting starts 25/11/00 Painting workshop for friends of Eden in the Gallery on a sunny afternoon.
17/11/00 A treat for the eyes inside the Humid Tropics biome (click here for more pictures) 17/11/00 What a lovely sight on and a good night (click here to see more pictures) 17/11/00 Pudsey Bear and the biomes are a glowing success on the night of 'Children in need' 16/11/00 Biomes will be illuminated tonight for Tim's talks and tomorrow for 'children in need'
16/11/00 Lake construction looking better. Path way down under construction.
16/11/00 Humid glowing in November sunshine. Temptation grass roof complete.
16/11/00 Roof to water store being fitted. Walk way entrance to biome for special visitors.
09/11/00 Chopper filming over Eden. Inside Temptation showing the biome link walkway
09/11/00 The path we know and love in front of the Gateway building is being dug up. help!
09/11/00 Lake gets serious pumping and sludge removal. Temptation coming on nicely.
06/11/00 Dark gray clouds, the vivid blues of the biomes and the greens of the plants plus a brief ray of sun.
06/11/00 Really different Christmas gifts in the Eden shop. I love the hand made soaps.
06/11/00 Spot the men on the cliff face planting trees, rather them then me.
06/11/00 Humid biome shining in the Cornish sunshine. Serious planting near the roofless biome
06/11/00 Lake pumped out again. Planting on bank near gateway building.
01/11/00 Eden's construction team hard at work on the humid biome! Well it's lunch time.
01/11/00 Lake landscaping going well. View of the Eden site.
A beautiful rainbow over Eden where the biomes have weathered the storms.
30/10/00 Warm vents and heating exchangers are looking good. Thousands of plants stored
30/10/00 Lake landscaping, tarmac being laid. Water store has plenty of water.
30/10/00 Biomes are fine after the wind speeds of up to 90 mph. during the storms.
25/10/00 More of the work on the warm biome. Very cold day but lots of visitor at Eden
25/10/00 Lake gets major landscaping. Warm biome has insulation installed along the joins
25/10/00 Drift wood horses turned a few heads in the gallery today, they are beautiful.
17/10/00 Planting of Arena bank going fine. A warm and cosy hut arrives for the till persons
17/10/00 Work on warm. Doors being sealed to test the heating.
13/10/00 Inside planting of the humid biome and outside building of the warm biome.
13/10/00 Building in warm biome. Insulation being fitted where the biomes join.
11/10/00 All the biomes look fine as soil is mixed by the lorry load.
11/10/00 Warm is getting more soil. Planting of the Arena bank going well in spite of the rain.
This is Page 2 Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105
You saw it First on www.eden-project.co.uk |
||
Back to Map Page Back to Index PageTo email me: Keith@eden-project.co.uk webmaster and photographer of this website.
|