The Large Lake-Water Store
21/03/01 A hedge now hides the lake
21/12/00 Tide is going out at last. 29/12/00 30/10/00 Lots of water 13/12/00 Water store at maximum
25/10/00 Lake (water store) wall building 30/10/00 More heavy rain and wind
11/10/00 The tide is in again after lots of rain. 17/10/00 Pumps are winning
04/10/00 06/10/00
28/09/00 Digger still working 03/10/00 Water level has dropped.
22/09/00 26/09/00 Digger playing at dam making.
05/09/00 15/09/00
04/09/00 Concrete rings being inserted in the middle of the lake.
03/08/00 07/08/00
28/07/00 Lots of work going on here. 31/07/00
Work going on next to the lake 18/07/00
04/07/00 07/07/00
Lots of work going on around the Lake 23/06/00
25/06/00
More being added as building progresses. |
Back to Map Page Back to EdenTo email me: Keith@eden-project.co.uk webmaster and photographer of this website. |
Copyright Keith Martin 2000 - All rights reserved |
The information on this site is not in anyway endorsed by the Eden Project |