Autumn 2020 to Summer 2021 at the Eden Project
Latest Happenings at Eden-Page 102
Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105
See the pictures here first! Canon EOS 550D is my current camera with 18 x 200 lens also on a Samsung Kzoom mobile phone (click on picture to enlarge, click back on your browser to return here)
26/04/21 The gate had to go. 26/04/21 The cranes are new and glistening with new paint. Even the electric poles tell what's happening here. 16/04/21 Eden's Geothermal Project moves ahead. 16/04/21 This look like the site where the main drilling will take place soon. 16/04/21 The site covers a fair area, there are a number of admin units. 07/01/21 Eden's Geothermal Project, drilling is almost under way with the arrival of conductor installation rig.This will drill a hole down to bedrock to enable installation of the conductor pipe. This forms the start collar for the well by isolating the loose ground. Drilling should take a few days. 07/01/21 Masses of pipes and tubes ready to be installed. A temporary fence is being replaced with a stronger green one that runs along a public footpath. 07/01/21 A trench has been dug leading back to Eden, I guess this is for fresh water and eventually carry hot water back to the Biomes. The rig can be seen lurking behind the trees with Carver moor in the background. 07/01/21 The equipment is huge, this is a very exciting project. I don't think the rig is in position as yet. The conductor pipe drilling should take a few days. 04/12/20 Eden open late on selected days leading up to Christmas 2020. 04/12/20 The ice rink in full swing and looking very nice and inviting. 04/12/20 Food is available in the Link. Tropical Trader shining bright in the Rainforest Biome. 04/12/20 Ultrasonic steam rising from the illuminated pool. 04/12/20 In the Rainforest Biome. 04/12/20 Rainforest Biome. 04/12/20 Rainforest Biome 04/12/20 Rainforest Biome. 04/12/20 Rainforest Biome. 04/12/20 Bamboo house in the Rainforest Biome. A grapevine view in the Med Biome. 04/12/20 Med Biome. 04/12/20 Med Biome. 04/12/20 Please come and visit Eden on a late opening evening. 02/11/20 Covid secure Eden, two days before another month lockdown of closure. 02/11/20 Eden has its own unique way to get the message across. 02/11/20 Sheltering from the Autumn showers. Even then the sun manages to shine on Eden. 02/11/20 The Ice rink is light and airy and in full swing. In the med Biome Autumn colours. 02/11/20 The Med biome still full of colour. 02/11/20 The work goes on, dead heading in a big way. 02/11/20 In the outdoor garden Rachel is up to her knees clearing the pond. 02/11/20 There's such a lot of tidying up to do in the Autumn. 02/11/20 Escaping the autonomy showers in the Rainforest Biome for a while. 02/11/20 It always transports me around the world without the need to fly. 02/11/20 The wonders of a blue bubble and a lot of work, see you again Eden soon! 17/10/20 Autumn colours all around Eden. 17/10/20 Its a good time to visit. 17/10/20 Lots to see and do just watch out for the witches. 17/10/20 Planting going on in the gardens. Grape vines going in next to the hemp hill. 17/10/20 Ice skating and meet the owls. 17/10/20 The shop has been expanded into ticketing with lots of space to move around safely. The cafe has moved into the gallery area for drinks and snacks. Face coverings must be warn in all indoor areas. 17/10/20 Open and airy seating for a limited selection for lunch mostly very tasty pizzas served in recyclable cardboard boxes. 24/09/20 Work underway on the Eden-Geothermal 24/09/20 Roadway is the first job
This is page 102
Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 You saw it first on www.eden-project.co.uk
|
Back to Map Page Back to Index PageTo email me: Keith@eden-project.co.uk webmaster and photographer of this website. Web site established since 1st June 1998 |